Durable Bridge
US$300.00-307.00 / Ton
View
  • Recommend for you
  • How to Install Prefabricated Pedestrian Bridges/Prefab Pedestrian Bridge
  • What is Heavy-Duty Prefabricated Steel Bailey Bridge for Construction Use
  • How to Make Durable Galvanized Steel Bailey Bridge for Affordable Shipping

How to Make Heavy-Duty Portable Bailey Skywalk Bridge for Pedestrian Access

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-99 Tons US$300.00

100-499 Tons US$307.00

500+ Tons US$300.00

Sepcifications

  • After-sales Service Installation Instructions
  • Warranty 6 Months
  • Certification GB, ASTM
  • Life Semi-Permanent Bridge
  • Across Way Diffuse Water Bridge
  • Lane Position Half Through Bridge
  • Usage Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge
  • Scale Middle Bridge
  • Stress Characteristics Beam Bridge
  • Material Steel Bridge
  • Transport Package Naked
  • Specification 45m
  • Trademark Zhonghai
  • Origin China
  • Product Capability 60000 Pieces Per Year
  • Standard ASTM, GB, BS, BV
  • Packing Packing in Containers or Bulk
  • Dimensions Standard or Customized

Product Description

Structure Portable Bailey Skywalkpedestrian Bridge CB321(100) Truss Press Limited Table No. Lnternal Force Structure Form Not Reinforced Model Reinforced Model SS DS TS DDR SSR DSR TSR DDR 321(100) Standard Truss Moment(kN.m) 788.2 1576.4 2246.4 3265.4 1687.5 3375 4809.4 ...

Learn More

Durable Bridge Comparison
Transaction Info
Price US $ 300.00-307.00/ Ton US $ 900.00-1,500.00/ Ton US $ 900.00-1,500.00/ Ton US $ 900.00-1,500.00/ Ton US $ 10/ Ton
Min Order 1 Tons 1 Tons 1 Tons 1 Tons 10 Tons
Payment Terms L/C, T/T, D/P L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification GB, ASTM DIN, JIS, GB, BS, ASTM, AISI DIN, JIS, GB, BS, ASTM, AISI DIN, JIS, GB, BS, ASTM, AISI DIN, JIS, GB, BS, ASTM, AISI
Management System Certification ISO 9001, ISO 14001 ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, HSE, QHSE ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, HSE, QHSE ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, HSE, QHSE ISO 9001, ISO 9000, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001, QSR
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue US$10 Million - US$50 Million US$10 Million - US$50 Million US$10 Million - US$50 Million US$10 Million - US$50 Million Above US$100 Million
Business Model OEM, ODM OEM, ODM, Own Brand(EVERCROSS) OEM, ODM, Own Brand(EVERCROSS) OEM, ODM, Own Brand(EVERCROSS) OEM, ODM, Own Brand(wanzhida)
Average Lead Time Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Product Attributes
Specification
After-sales Service: Installation Instructions;
Warranty: 6 Months;
Life: Semi-Permanent Bridge;
Across Way: Diffuse Water Bridge;
Lane Position: Half Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Beam Bridge;
Material: Steel Bridge;
Product Capability: 60000 Pieces Per Year;
Standard: ASTM, GB, BS, BV;
Packing: Packing in Containers or Bulk;
Dimensions: Standard or Customized;
After-sales Service: Guidance and Installation Services;
Warranty: 3 Years;
Life: Temporary Bridge;
Across Way: Fixed Bridge;
Lane Position: Deck Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Truss Bridge;
Material: Steel Bridge;
Steel Grade: S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460;
Loading Capacity: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
Application: Railway and Highway;
Standard: AISI, ASTM, BS, DIN, GB, JIS;
Loading Standard: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
After-sales Service: Guidance and Installation Services;
Warranty: 3 Years;
Life: Temporary Bridge;
Across Way: Fixed Bridge;
Lane Position: Deck Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Truss Bridge;
Material: Steel Bridge;
Steel Grade: S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460;
Loading Capacity: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
Application: Railway and Highway;
Standard: AISI, ASTM, BS, DIN, GB, JIS;
Loading Standard: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
After-sales Service: Guidance and Installation Services;
Warranty: 3 Years;
Life: Temporary Bridge;
Across Way: Fixed Bridge;
Lane Position: Deck Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Truss Bridge;
Material: Steel Bridge;
Steel Grade: S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460;
Loading Capacity: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
Application: Railway and Highway;
Standard: AISI, ASTM, BS, DIN, GB, JIS;
Loading Standard: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
Life: Semi-Permanent Bridge;
Across Way: Diffuse Water Bridge;
Lane Position: Down Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Suspension Bridge;
Material: Steel Bridge;
Delivery Time: 15-45 Days;
OEM/ODM: OEM ODM;
File Formats: Solid Works, Autocad(Dxf, Dwg), Pdf;
Sample Time: 7 Days If Standard Parts We Have;
Processing: CNC Turning, CNC Milling, CNC Drilling, Laser Cut;
Supplier Name

Jiangsu Zhonghai Bridge Equipment Co.,Ltd.

Diamond Member Audited Supplier

Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.

Diamond Member Audited Supplier

Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.

Diamond Member Audited Supplier

Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.

Diamond Member Audited Supplier

Shandong Wanzhida New Material Technology Co., Ltd

Diamond Member Audited Supplier