Toe Board
US$9.50 / Piece
  • Recommend for you
  • What is Heavy-Duty Adjustable Steel Props for Reliable Shoring Systems
  • What is Strong and Safe Scaffolding Plank for Construction Sites
  • How to Make Premium Ringlock Cuplock System Scaffold Manufacturer for Global Buyers

What is Toe Board for Ringlock Scaffold

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$9.50 / Piece

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Integral Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Toe Board
  • Construction Properties Building Scaffold
  • Transport Package Steel Pallet
  • Specification 48.3mm
  • Trademark METEC
  • Origin China
  • Certificate CE, TUV, SGS
  • Factory Certificate ISO9001
  • Finished Pre-Galvanized
  • Steel Class Q345, Q235

Product Description

Scaffolding toe board used for ringlock scaffolding Material: Q235 Finished: pre-galvanized Length: 2' to 10'( as your requirement) width of top and bottom edge: 19mm Item Description Weight ITB-30 3' Interlocking Toe Board 2.8 kg ITB-40 4' Interlocking Toe Board 3.7 kg ITB-50 5' ...

Learn More

Toe Board Comparison
Transaction Info
Price US $ 9.5/ Piece US $ 12.00-19.00/ Piece US $ 12.00-19.00/ Piece US $ 12.00-19.00/ Piece US $ 12.00-19.00/ Piece
Min Order 100 Pieces 1000 Pieces 1000 Pieces 1000 Pieces 1000 Pieces
Payment Terms L/C, T/T L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification CE, TUV, SGS - - - -
Management System Certification ISO 9001 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001
Trade Capacity
Export Markets North America, South America, Western Europe - - - -
Annual Export Revenue US$10 Million - US$50 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million
Business Model OEM, ODM OEM, Own Brand() OEM, Own Brand() OEM, Own Brand() OEM, Own Brand()
Average Lead Time Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Peak Season Lead Time: one month
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Integral Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Toe Board;
Construction Properties: Building Scaffold;
Factory Certificate: ISO9001;
Finished: Pre-Galvanized;
Steel Class: Q345, Q235;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Size: 68mm, 40mm;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Size: 68mm, 40mm;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Size: 68mm, 40mm;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Size: 68mm, 40mm;
Supplier Name

Wuxi Metec Metal Co., Ltd.

Diamond Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

Gold Member Audited Supplier