Specification |
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: EN, API650, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Brushed;
Production Type: Mass Production;
Machining Method: CNC Machining;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
|
Application: Fastener, Auto and Motorcycle Accessory, Machinery Accessory;
Standard: GB, EN, API650, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Polishing;
Production Type: Mass Production;
Machining Method: CNC Machining;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Drawing Format: 2D/(Pdf/CAD)3D(Iges/Step);
Equipment: CNC Lathe Machine/Milling Machine/Turning Machine;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, API650, China GB Code, JIS Code, TEMA, ASME;
Production Type: Mass Production;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Tolerance: 0.001 ~0.005mm, Min Ra 0.05~0.4 or Customized;
Lead Time: Sample 7-10 Days; Mass 2-4 Weeks;
OEM/ODM: Accecpted;
Process: CNC Turning, CNC Milling, 5-Axis Machining, Sheel;
Finish: Polishing, Sand Blasting,Anodized, Plating etc.;
Drawing Format: 2D-CAD/Pdf, 3D-Step;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, API650, China GB Code, JIS Code, TEMA, ASME;
Production Type: Mass Production;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Tolerance: 0.001 ~0.005mm, Min Ra 0.05~0.4 or Customized;
Lead Time: Sample 7-10 Days; Mass 2-4 Weeks;
OEM/ODM: Accecpted;
Process: CNC Turning, CNC Milling, 5-Axis Machining, Sheel;
Finish: Polishing, Sand Blasting,Anodized, Plating etc.;
Drawing Format: 2D-CAD/Pdf, 3D-Step;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, API650, China GB Code, JIS Code, TEMA, ASME;
Production Type: Mass Production;
Material: Nylon, Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Tolerance: 0.001 ~0.005mm, Min Ra 0.05~0.4 or Customized;
Lead Time: Sample 7-10 Days; Mass 2-4 Weeks;
OEM/ODM: Accecpted;
Process: CNC Turning, CNC Milling, 5-Axis Machining, Sheel;
Finish: Polishing, Sand Blasting,Anodized, Plating etc.;
Drawing Format: 2D-CAD/Pdf, 3D-Step;
|